“The quote covers the new floor. The customer assumed it also covers carpet removal and subfloor work.”
Separate removal, installation, and prep in the quote so both sides can see what the total includes.
Build installation quotes from measured area and the material the customer chose. Account for tear-out, subfloor prep, stairs, and trim, then carry the approved scope into your installation schedule.

Measured areas, material choices, and installation details in the same job. Built for four-season trade & service teams
“The quote covers the new floor. The customer assumed it also covers carpet removal and subfloor work.”
Separate removal, installation, and prep in the quote so both sides can see what the total includes.
“We measured the rooms but forgot the stairs and transitions.”
Record the stair count in the estimate and add any transitions or trim that the site needs.
“A product change moved the delivery date, but the crew still has the old start date.”
Keep material notes on the job and update the installation schedule once delivery is confirmed.
Use your own inputs. The calculator starts with example values.
A 35% profit margin is not a 35% markup. Adjust labour, materials and target margin for a flooring job to see your exact pre-tax and tax-included quote total.
Formula: Quote Price = $600 direct cost ÷ (1 − 0.35) = $923.
Make clear who supplies flooring and what prep and finish work the quote covers.
Example figures and terms. Replace them with your own before sharing.
Measure stairs and transitions separately and verify waste for the selected product and layout.
Record area by room, count stairs, and note transitions, existing flooring, and subfloor conditions.
Select the flooring material and the relevant removal and preparation options. Confirm waste, trim, and unusual site conditions in your line items.
Send a quote with the product and the agreed preparation work. Confirm material availability before committing to an install date.
Share the approved scope with the crew and record final work or agreed changes before invoicing.
Start with the estimator’s material options for hardwood, engineered wood, vinyl plank, laminate, tile, and carpet. Review the quantities and replace starting costs with your own rates.
Use the prep option when levelling is in scope. Describe any additional work that requires a site check or customer approval.
Record the chosen product and finish in your scope, along with who supplies it. The installer can refer to the approved job details when materials arrive.

The flooring installation template includes laminate, luxury vinyl plank, hardwood, engineered wood, tile, and carpet.
Yes. The estimator has a subfloor prep option and a stair count. Review those items alongside removal and installation before creating the quote.
Yes. Turn off material supply in the estimator and review the remaining installation, preparation, and removal line items.
Explore the live demo, test a workflow, or compare our current plans.